Develop a 4 page paper that addresses the following:
1. Illustrate two (2) advantages and two (2) challenges associated with fast
tracking and provide examples based on your own experience (not examples
from the text).
2. Discuss both what it means and possible causes for a project with a CPI of 1.2
and an SPI of 0.8 (include hypothetical figures for PV, AC, and EV in your
discussion).
3. Discuss the benefit of effective project closure using examples to support your
answer.
4. Recommend two (2) best practices concerning project closure that would apply
to almost any project.
The format of the paper is to be as follows:
o Typed, double-spaced, Times New Roman font (size 12), one-inch margins on
all sides (APA format).
o Use headers for each of the subjects being covered, followed by your response.
o In addition to the 4 pages required, a title page is to be
included. The title page is to contain the title of the assignment, your name, the
instructor’s name, the course title, and the date.
Note: You will be graded on the quality of your answers, the logic/organization of the
report, your language skills, and your writing skills.